Home Renovation Guide 2026: Stages, Costs and What to Watch For

Renovating a home looks simpler than building one, but without the right order and the right budget it brings far more surprises. The stages, 2026 costs and what to watch for.

A home renovation can range from painting a wall to rebuilding all the services and interiors from scratch. The bigger the scope, the more the order of works, a realistic budget and early decisions matter. In this article we explain the stages of a renovation, current cost ranges for 2026 in Türkiye and the most common mistakes.

Do You Need a Permit?

Under Article 21 of the Turkish Zoning Law, works that do not affect the structure, such as plastering, painting, windows, flooring, ceiling finishes, and renewing electrical and plumbing installations, do not require a building permit. Works that touch structural elements, meaning columns, beams and shear walls, or that change the façade or common areas, do require permission. In apartment buildings, changes to the façade and common areas also need the consent of the other owners under the Condominium Law. Changes to gas installations may only be made by licensed companies with the approval of the gas distribution company.

The Stages of a Renovation

  • Survey and brief: the existing home is inspected on site, the age and condition of the services and any damp or insulation problems are identified.
  • Design: layout, materials, lighting and furniture are decided at this stage. Renders let you see the result in advance.
  • Budget and bids: several bids are collected on the same material list and quantities.
  • Preparation: the building management and neighbours are informed and any permits are obtained.
  • Strip-out: old finishes, cabinets and, if needed, services are removed.
  • Services: electrical, water, drainage and gas lines are renewed before the walls are closed.
  • Base works: plaster, skim coats, screed and waterproofing of wet areas.
  • Finishes: tiles, flooring, doors and windows are installed and walls are painted.
  • Fit-out and handover: kitchen, bathroom and lighting are installed, followed by final checks and cleaning.
The study of G Güneş House with a walnut-panelled wall and a stone table
Decisions on material and light: G Güneş House

Home Renovation Costs in 2026

Renovation costs vary greatly with the scope, the level of materials and the location. Industry estimates published for Istanbul in 2026 show these ranges:

ScopeApproximate cost (for 2026)
Partial renovation (paint, flooring, small updates)6,000 to 10,000 TL/m²
Medium renovation (including kitchen or bathroom)10,000 to 18,000 TL/m²
Full renovation (services, wet areas, all finishes)18,000 to 32,000 TL/m²

Approximate ranges by item:

ItemApproximate cost (for 2026)
Bathroom renovation (4 to 6 m²)95,000 to 450,000 TL
Kitchen renovation (8 to 12 m²)130,000 to 800,000 TL
Interior painting (materials and labour)200 to 600 TL/m²
Laminate flooring (materials and labour)800 to 2,000 TL/m²
Rewiring (two-bedroom flat)100,000 to 300,000 TL
New plumbing (two-bedroom flat)120,000 to 250,000 TL

The ranges are this wide because of the choice of materials. The same bathroom comes close to the lower end with economical tiles and sanitary ware, and close to the upper end with large-format natural stone, concealed cisterns and custom cabinets. These are approximate values, and a precise budget requires a survey and quantities.

What to Watch For

  • Do not touch the structure. Columns, beams and shear walls must never be cut, drilled through or removed. Have the structural drawings checked before removing any wall.
  • Renew services before closing the walls. Laying new finishes over old pipes and cables means breaking them open again in a few years.
  • Waterproof wet areas. In bathrooms and kitchens, waterproofing must be applied and tested before tiling. A stain on the downstairs neighbour’s ceiling is the most expensive surprise.
  • Decide early. Choose tiles, fittings and cabinets before work starts. Decisions made on site bring both delays and extra costs.
  • Put it in writing. The scope, material list, schedule and payment plan should be written down.
  • Keep a contingency. Setting aside 10 to 15 percent of the budget for surprises found during strip-out, such as damp, rotten pipes or uneven floors, is wise.
  • Follow the building rules. Agree on hours for noisy work with the management and protect common areas when moving debris and materials.
A bedroom of G Güneş House with timber wardrobes and a full-height window
Simple, lasting materials: G Güneş House

Why Work with an Interior Architect?

A good renovation design does not only refresh a home, it makes it work better. Thinking about layout, storage, lighting and materials together gives a far better result for the same budget. An architect who follows the works on site keeps the right order and makes sure materials are installed to specification. Get in touch with us about your home renovation and interior design.

This article is for general information only. Costs are based on industry estimates published as of November 2026 and vary with location, materials and scope.