Urban Regeneration
Turning ageing building stock into liveable, lasting new neighbourhoods.
A Holistic Approach
Urban regeneration is more than replacing an old building with a new one. In every project we consider the potential of the plot, the character of the neighbourhood, the relationship with the street and the people who will live there.
From Design to Construction
We run the whole process in one team, from preliminary and permit drawings to construction documents, from façade and landscape design to architectural visualization for sales and presentations. During construction, site supervision keeps the built result true to the design.
Valora Park Residences, Silivri
Designed as part of an urban regeneration initiative in Silivri, Valora Park Residences brings together residential, commercial and office functions. Shops on the ground floors connect the buildings to the street, while the upper floors hold the apartments.
How Does Urban Regeneration Work?
Urban regeneration moves through seven steps, from the risky building assessment to the handover of the new building.
Risky Building Assessment
The building’s earthquake risk is assessed by an institution licensed by the Ministry of Environment, Urbanisation and Climate Change.
Title Deed Annotation and Objection
The risky building decision is recorded on the title deed, and owners have 15 days to object.
Owners’ Meeting and Decision
Owners decide how the new building will be built by simple majority, that is, by more than half of the shares.
Contractor Selection and Contract
Offers are compared, and the sharing of flats, the schedule and the guarantees are written into the contract.
Evacuation and Demolition
The building is vacated and demolished, and owners can receive rent assistance.
Design and Permit
Architectural and engineering drawings for the new building are prepared and the building permit is obtained.
Construction and Handover
The building is completed under building inspection, the occupancy permit is obtained and the flats are handed over.
How Long Does Urban Regeneration Take?
| Stage | Typical duration |
|---|---|
| Risky building assessment and title deed annotation | 1 to 2 months |
| Owners’ decision and contractor agreement | 2 to 6 months |
| Design and permit | 4 to 8 months |
| Construction and occupancy permit | 18 to 30 months |
Which Laws Apply?
Urban regeneration is based on Law No. 6306 on the Transformation of Areas under Disaster Risk (Official Gazette, 31 May 2012). Amendments made in 2023 set the decision quorum at a simple majority. Under article 7 of the law, title deed, permit and zoning procedures within regeneration are exempt from the related fees and charges. The new building is designed under the Zoning Law, the Planned Areas Zoning Regulation and the Turkish Building Earthquake Code.
Which State Support Is Available?
- Half from Us campaign: for risky buildings in İstanbul, a grant of 875,000 TL, a loan of 875,000 TL and 125,000 TL moving support per home. The campaign has been extended to 31 December 2026.
- Rent assistance: for owners who move out during demolition, under certain conditions.
- Fee and charge exemptions: under article 7 of Law No. 6306.
For the support and the process, see our article on urban regeneration steps. Confirm the current conditions with the Ministry and the municipality before applying.
What Does My Building Need?
- Title deed records and the list of owners
- Drawings of the existing building, if any
- Risky building report (if there is none, we start the assessment together)
- Owners’ expectations and meeting minutes
How Much Does Urban Regeneration Cost?
Cost depends on the building’s total construction area and number of units. Choose Urban Regeneration in our cost calculator to see your building’s approximate budget and the total grant.