The structural system is the skeleton that safely carries the building’s own weight, the loads inside it, wind and earthquakes down to the ground. Shell construction is the stage in which this skeleton and the main envelope of the building are built, from the foundations to the roof. Once the finishes are done it becomes invisible, but the safety and lifespan of the building are decided here.
Types of Structural System
- Reinforced concrete: the most common system in Türkiye. It consists of columns, beams, shear walls and slabs. It allows flexible plans and, when built well, is safe in earthquakes.
- Steel: light, quick to erect and easily spans wide openings. It needs protection against fire and corrosion.
- Timber: a natural, light and sustainable option. Suitable for low-rise buildings and detached houses, it needs careful detailing against moisture and fire.
- Light steel and prefabricated systems: fast to build with predictable costs, but architectural flexibility can be limited.
The architect and the structural engineer choose the system together, based on the size of the building, the spans, the soil, the budget and the architectural character wanted.
Soil and Foundations
Everything starts with the soil. The soil investigation reveals the bearing capacity, groundwater and earthquake behaviour of the ground, and the foundation type is chosen accordingly. Pad or strip foundations are used on firm ground, while a raft foundation, a slab spread under the whole building, is used on weaker ground and for buildings with basements. Waterproofing basement foundations and retaining walls is one of the hardest things to repair later, so it must be done right the first time.
Stages of Shell Construction
- Excavation and ground improvement
- Blinding concrete, foundation waterproofing and the foundation pour
- Basement retaining walls and waterproofing
- Formwork, reinforcement and concrete for columns, walls, beams and slabs, floor by floor
- Masonry walls
- Roof structure and roof covering

Earthquake Code and Material Quality
Since 2019, buildings in Türkiye are designed to the Turkish Building Earthquake Code. For reinforced concrete it requires at least C25 concrete and B420C ribbed reinforcing steel. The right materials alone are not enough, though. Concrete must be placed, compacted and cured properly on site, the reinforcement must be laid at the diameters and spacing shown in the drawings, and the concrete cover over the reinforcement must be kept.
What to Watch for on Site
- Check the reinforcement against the structural drawings before every pour.
- Make sure samples are taken from every pour and tested in a laboratory.
- Do not allow water to be added to the concrete. It seriously reduces its strength.
- Protect pours in hot and cold weather.
- Never cut through beams or walls afterwards for services. Openings must be planned in the drawings and left in the formwork.
- Make sure the architectural and structural drawings are coordinated. Every conflict left to be solved on site is a compromise on the structure.
The building inspection company checks this process by law. In addition, having an architect who knows the project follow the site keeps shell construction both safe and true to the design. Get in touch with us for shell construction and construction management.
This article is for general information only. Structural decisions are made for each project by a licensed structural engineer.