The first question people ask about building a villa is usually the same: what does it cost per square metre? The answer varies widely with the size of the villa, the site, the level of materials and extras such as a pool and landscaping. In this article we start from the official unit costs and draw a realistic budget framework for 2026.
Official Unit Costs
Every year the Ministry of Environment, Urbanisation and Climate Change publishes approximate unit costs by building class. According to the notice published in the Official Gazette on 3 February 2026, detached houses of 200 to 500 m² fall into class III-C at 23,400 TL/m², and those of 500 m² and above into class IV-B at 33,900 TL/m². These are the official figures used to calculate fees and design charges. On the market, and especially for villas with fine materials, the real cost is well above them.
Villa Costs in 2026: Three Levels
Based on our studio’s current design and construction experience, turnkey villa construction costs range approximately as follows:
| Level | Approximate cost (for 2026) |
|---|---|
| Essential: standard range materials, simple details | 30,000 to 42,000 TL/m² |
| Quality: fine materials, interior and landscape design | 44,000 to 55,000 TL/m² |
| Premium: bespoke design, natural stone, solid timber, smart home | 60,500 to 94,880 TL/m² |
For example, a 300 m² villa at the Quality level needs a construction budget of roughly 13.2 to 16.5 million TL. These figures exclude the land, VAT, a pool and extensive landscaping.

What Shapes the Budget
- Site and ground: on sloping sites, excavation, retaining walls and ground improvement can raise the budget considerably. A soil survey should be done at the start.
- Structure: long spans and cantilevers mean more steel and concrete. The choice between concrete, steel or a hybrid system should be made together with the architectural design.
- Façade and glazing: large glazed surfaces, thermally broken aluminium frames and natural stone cladding are among the largest items in a villa budget.
- Pool: the cost depends on size, overflow or skimmer system, finish and heating. Get a separate quote for it.
- Landscape: garden design, hard landscaping, irrigation and lighting can make up a significant share of the total.
- Mechanical systems: underfloor heating, heat pumps, solar panels and smart home systems raise the initial investment but lower running costs.
- Interiors and furniture: bespoke kitchens, bathrooms and furniture define the character of a villa and should be planned separately in the budget.
The Villa Building Process
- Site analysis: zoning status, floor area ratio, setbacks and soil survey.
- Concept design and 3D visualization: plan, massing and material decisions, with renders to see the result in advance.
- Construction drawings and permit: architectural, structural, mechanical and electrical drawings and municipal approval.
- Shell construction: excavation, foundation, structure and roof.
- Finishing works: services, windows, façade, finishes, kitchens and bathrooms.
- Landscape, pool and handover: outdoor works, final checks and occupancy permit.
Design and permits usually take a few months, and construction takes 8 to 24 months depending on the size and level of detail.
Getting the Budget Right
The biggest deviations in a villa budget come from decisions made on site. Settling materials, glazing, kitchen and mechanical systems in the design, getting bids on the same scope and keeping a 10 to 15 percent contingency is the soundest approach. Having the same team run both design and construction also keeps these deviations to a minimum.
This article is for general information only. Official unit costs are based on the 2026 notice and the level ranges on our studio’s estimates as of November 2026. Amounts exclude VAT and vary with the site, location and scope.